Sound, AV and stage lighting
In a single season, the State Theatre may host grand opera, classical ballet and large-scale musicals, requiring technical systems capable of supporting an exceptionally broad range of productions. Our AV design delivers a new integrated sound system with digital processing and state-of-the-art mixing, anchored by a new permanently installed center cluster that provides clear, consistent sound throughout the auditorium. Loudspeakers and technical equipment have been discreetly integrated into the wall and ceiling linings, allowing the technology to support the room without intruding on its heritage character.
The new stage lighting system is supported by a fibre optic production network that distributes lighting data throughout the stage and auditorium, allowing touring and resident companies to deploy modern LED and moving light rigs with minimal reworking of the venue’s infrastructure. Integrated with the flying system we delivered earlier, lighting and rigging operate together as a coordinated production platform that is easier for venue staff to run day to day while retaining the flexibility required for major productions.
Behind the scenes, the theatre’s new performance video, relay and communications systems connect the stage with the people who need to see and hear what is happening. Low-latency cameras provide live views of the conductor, musical director and performers to stage management and production teams, while a new IPTV system distributes performance video and audio throughout backstage and front-of-house areas, carrying broadcast feeds, show-call information and latecomer viewing. Recording and archiving capabilities allow performances and production information to be captured for future use.
The new production communications system brings together the Stage Manager’s Console, cue lights, paging and technical communications, allowing information to move quickly between stage management, technical teams and performers. Hearing augmentation has also been integrated across the auditorium, backstage areas and Stage Door, improving accessibility throughout the building. Together, these systems form the infrastructure behind every performance, helping staff coordinate complex productions while making the building easier to operate every day.
Loading dock
The future of a theatre arrives in a truck, so for a venue to be successful, the dock needs to be well designed. ACM’s stages are three levels below street level, so the dock must include a truck lift that can handle an entire semi-trailer. That lift is the venue’s lifeline, and any problem with it affects the whole operation.
Working with ACM and the design team, we helped radically redesign the dock around two criteria. There should be two lifts to reduce operational risk, and trucks should be able to drive straight on and straight off without unusual manoeuvres. The new dock is still under construction and due to be completed in 2027. The excavation for the dock will also create space for a future rehearsal space, function room and other amenities.